When construction managers look to build a project team, their primary mission is to select a reliable subcontractor with accurate estimates and the experience to perform. With a reputation for dependability, Nappa Electric has solidified our name as the preferred electrician for many general contractors. We work transparently during the bid process and look to provide outstanding field and project management services from preconstruction, procurement, through completion.


Hirshberg Wozny Dental Group

Wellesley, MA
Completed - 2024

  • 3,000 sqft. Dental office

  • 150A tenant service, (9) Hygienist and Treatment rooms, imaging room, multiple offices, break room, entry/reception area

  • Architectural lighting throughout and power for specialized dental equipment


6k Inc.

North Andover, MA
Completed - 2023

  • 45,000 sqft. Multiphase Office/lab/R&D space

  • 4000A service, a 600kw generator, gas detection, and extensive downstream distribution, Tel/Comm scope

  • Kitchen/café area, open & private offices, ADA chairlift, architectural lighting, multiple conference rooms


Motif

Marlborough, MA
Completed - 2022

  • 10,000 sqft. Office space

  • Open & private offices, boardroom with Architectural Lighting, cafe area


client confidential - life science

Watertown, MA
Completed - 2022

  • 38,000 sqft. (2)Floor lab/office fitup

  • R&D Lab, cGMP clean rooms, 1-Megawatt generator, Offices, Conference Rooms, 150kw UPS system, wireless lighting controls, cable tray installation


Elevatebio basecamp

Waltham, MA
Completed - 2021

  • 90,000 sqft. 2-Floor Flexible Lab, Science Center

  • R&D Lab, cGMP Suites, 2-Megawatt generator, Office, Conference Rooms, Lightning Protection system, BDA System


smartlabs

Cambridge, MA
Completed - 2019

  • 43,000 sqft. 2-Floor base building renovation

  • Complete tenant fit-up for SmartLabs featuring, 2000A switchboard, 350kw gas generator, (22) individual electronic metering system for extensive branch power panels. Wireless lighting controls system with grid lighting throughout.


carbon black

Waltham, MA
Completed - 2015

  • 60,000 sqft. 2-Floor tenant fit-up


lionbridge

Waltham, MA
Completed - 2014

  • 53,000 sqft. 2-Floor tenant fit-up