When construction managers look to build a project team, their primary mission is to select a reliable subcontractor with accurate estimates and the experience to perform. With a reputation for dependability, Nappa Electric has solidified our name as the preferred electrician for many general contractors. We work transparently during the bid process and look to provide outstanding field and project management services from preconstruction, procurement, through completion.
Hirshberg Wozny Dental Group
Wellesley, MA
Completed - 2024
3,000 sqft. Dental office
150A tenant service, (9) Hygienist and Treatment rooms, imaging room, multiple offices, break room, entry/reception area
Architectural lighting throughout and power for specialized dental equipment
6k Inc.
North Andover, MA
Completed - 2023
45,000 sqft. Multiphase Office/lab/R&D space
4000A service, a 600kw generator, gas detection, and extensive downstream distribution, Tel/Comm scope
Kitchen/café area, open & private offices, ADA chairlift, architectural lighting, multiple conference rooms
Motif
Marlborough, MA
Completed - 2022
10,000 sqft. Office space
Open & private offices, boardroom with Architectural Lighting, cafe area
client confidential - life science
Watertown, MA
Completed - 2022
38,000 sqft. (2)Floor lab/office fitup
R&D Lab, cGMP clean rooms, 1-Megawatt generator, Offices, Conference Rooms, 150kw UPS system, wireless lighting controls, cable tray installation
Elevatebio basecamp
Waltham, MA
Completed - 2021
90,000 sqft. 2-Floor Flexible Lab, Science Center
R&D Lab, cGMP Suites, 2-Megawatt generator, Office, Conference Rooms, Lightning Protection system, BDA System
smartlabs
Cambridge, MA
Completed - 2019
43,000 sqft. 2-Floor base building renovation
Complete tenant fit-up for SmartLabs featuring, 2000A switchboard, 350kw gas generator, (22) individual electronic metering system for extensive branch power panels. Wireless lighting controls system with grid lighting throughout.
carbon black
Waltham, MA
Completed - 2015
60,000 sqft. 2-Floor tenant fit-up
lionbridge
Waltham, MA
Completed - 2014
53,000 sqft. 2-Floor tenant fit-up